RFQ Template for Machined Semiconductor Parts
Quotes stop being comparable when each shop fills a different gap with a different assumption. This template closes the gaps.
Copy it into an email or a document. Nothing here is gated, tracked or emailed to you.
The template
SUBJECT: RFQ - [part name] - [your company] - [quantity] 1. PART Part name and number: Revision: Files attached: STEP [yes/no] PDF drawing [yes/no] Other: Part family: chamber / gas delivery / wafer handling / test or change kit / frame / spare Overall size (mm): 2. MATERIAL Material and temper: Certificate required: mill certificate / none Substitutions acceptable: yes / no 3. TOLERANCE AND FORM Tightest linear tolerance: Flatness / parallelism, with datum scheme: Measurement condition: free state / constrained (state bolt pattern and torque) Critical characteristics (list the features that matter): 4. SURFACE AND FINISH Surface finish, by surface (Ra, with unit): Finish type and thickness: Masked features: Rack mark restrictions: 5. CLEANLINESS AND PACKING Cleaning level: Packing: standard / degreased and double bagged / cleanroom packed Handling restrictions: 6. INSPECTION AND DOCUMENTS First article required: yes / no Report scope: full layout / critical characteristics only / sampling Reports per lot: yes / no Certificates required: material / finish / heat treatment / weld 7. QUANTITY AND SCHEDULE Quantity this order: Repeat schedule (approximate is fine): Needed by: Spare / second piece wanted with this order: yes / no 8. COMMERCIAL Delivery destination: Incoterm: NDA required before files are shared: yes / no Quote validity requested: 9. QUOTE FORMAT REQUESTED Please return these as separate lines: unit price, setup or tooling, first article cost, finishing cost, inspection cost, packing, lead time in working days, quote validity.
Why each block is there
- 1. PartThe family narrows the supplier list faster than the drawing does. Say it explicitly.
- 2. MaterialStating the certificate requirement up front is cheap. Adding it after delivery is impossible.
- 3. ToleranceForm controls and the datum scheme, not just plus or minus. Say free state or constrained.
- 4. FinishName the surfaces. A blanket note prices the whole part at the tightest number on it.
- 5. PackingCleanroom packing is labour and consumables. Left unsaid, the cheapest quote is the one that assumed a cardboard box.
- 6. InspectionFirst article plus sampling and a full report per piece are different prices and different schedules.
- 7. ScheduleA stated repeat schedule usually prices better than the same quantity ordered lot by lot.
- 8. CommercialDestination and Incoterm move the comparable price. Not every shop exports on its own documents.
- 9. Quote formatSeparate lines are what let you see where a difference actually comes from.
Or send it to us once
Fill the form instead and we put the same information in front of up to 3 shops that fit the part. Reply within 24 business hours.